How long does a building inspection take?
This is dependent on the size of the building. For an average size house (3-4 bedrooms), we allow 1 1/2 to 2 hours on site. For larger buildings, more time may be required.
Get your property report within 24hrs
This is dependent on the size of the building. For an average size house (3-4 bedrooms), we allow 1 1/2 to 2 hours on site. For larger buildings, more time may be required.