Vertical timber scriber boards and a metal head flashing is required to the back door.
|
Poor deflector flashing detail, repairs are required to the crack in the cladding.
|
This fascia board penetrates through the exterior cladding. This is a poor detail.
|
The lead flashing captures and directs water onto the head of the stair entrance door. There are signs of water damage to the head of this door on the inside.
|
The front entry concrete paving has been poured up against the exterior cladding. This cladding is starting to rot. Current regulations sate that the paving should finish at a minimum of 150mm below the interior finished floor level. This detail will not comply with current regulations.
|
The boxed detail above the windows are reliant on sealant for water protection.
|
The gable end cladding sheet joins are reliant on sealant for water protection.
|
|